Melrose End
OO Gauge by
Brian & Matthew Davis
Melrose End has been designed to be shown
at exhibitions and for use at home. The main emphasis of the
layout is keeping operators and spectators interested in stock
movements. The layout is split into two operating sections.
A goods yard which consists of a run round loop and three long sidings
for coal, open, and closed rolling stock.
The station has a bay platform and a main
platform which has a run round loop for three large, or four smaller,
coaches.
Other facilities are a private siding
owned by an engineering company, and a two road LNWR engine shed with
coal and water facilities.
The buildings are scratchbuilt, or kit
built which have interiors and details added.
The rolling stock is kit built or ready
to run with loads added. The period portrayed is 1930's - 1940's
and the LMS and LNER have joint running rights.
Pictures taken at the
Rainhill MRC 'Model Rail 2008'.
You can see all the model railway layouts featured at SimplyTrains on the layouts page. [more]
If you would like your pictures of model
trains or model railway layouts to appear
here then please email us or check for more details. [more]
Email us.
-
-
-
-
|
Click on the pictures to enlarge. Hit
your browsers back button to return.



 |
Click on the pictures to enlarge. Hit
your browsers back button to return.



 |